Week 3 Highlights
The Grudge project showed lots of progress over the week. However, nothing as grand as the week before. The exterior received all the necessary additions to make it ready for siding and roofing next week. The metal is ordered. The windows and door are framed in. Late in the week, we got a load of gravel that got spread out in preparation for the concrete. However, a bunch of trenches had to be dug for plumbing, electrical and the floor drain beforehand.
On the bunkhouse front, Juni has been piling fill dirt from a borrow on the other side of the road across from the mailbox. It all goes into extending what will be the parking apron behind the bunkhouse. When that played out, we started digging behind the tobacco barn.